Impact evaluation study of the project intensification and expansion of distribution system of 18 palli bidyut Samitee (PBS) 2nd phase (revised) /

By: Contributor(s): Material type: TextPublication details: Dhaka : Ministry of Planning, 2011.Description: vii, 134. (vatious pagings) : ill. ; 28 cmSubject(s): DDC classification:
  • 621.319 BAI 2011
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Barcode
Books Bangladesh Public Administration Training Centre Library 621.319 BAI 2011 Available G5139
Books Bangladesh Public Administration Training Centre Library General Reading Room 621.319 BAI 2011 Available mizan G5137

There are no comments on this title.

to post a comment.